Skip to content Skip to footer

Project Overview

Rutson Energy was responsible for designing and installing electrical infrastructure for the East Africa Burundi Textile factory. The project ensured stable, efficient power distribution, improving the factory’s operational reliability.

Challenges & Solutions

One challenge was fluctuating power demand, which required a load management system to balance energy distribution efficiently. Additionally, future scalability was considered, so the infrastructure was designed to accommodate potential factory expansion. Lastly, electrical safety compliance was essential, leading to the installation of surge protection and proper grounding systems to meet industrial standards.

Benefits & Impact

With stable and efficient power, the factory significantly reduces production downtime caused by outages. The upgraded infrastructure also enhances workplace safety and energy efficiency, leading to lower operational costs.

Would you like this type of service?
Project Key Details

This industrial project involved the design and installation of electrical infrastructure including a 330kVA generator, switchboards, and lighting systems, ensuring uninterrupted power for textile production.

System Size & Capacity330kVA Generator + Electrical InfrastructureType of InstallationIndustrial Power SystemEquipment UsedGenerator, switchboards, electrical busways, lighting systems, CCTV, telephone systemsAuthorRutson EnergyLocationGitega, BurundiShare

Subscribe for the updates!